With environmentally friendly buildings and low running costs the Ludlow Eco Park sets the benchmark for modern office buildings.
Alliance Court has the dual advantages of an attractive location with good communications and provides the only offices of its kind in the area.
§Very sustainable and ecologically responsible building achieving Building Research Establishment Environmental Assessment Method Excellent Standard – the Government’s highest industry standard for construction design and build
§Low energy heating and hot water with the highest efficiency boilers
§Excellent insulation and openable windows allowing comfortable internal conditions
§Water leakage detection and good water management
§Locally sourced materials with minimum energy used in transportation
§Very low CO2 emissions
§Public transport Park & Ride on site
§Excellent air quality location
Any size requirements can be accommodated within the overall footplates on a design and build basis with a specification to suit the requirements of all occupiers.
PHASE 1 - Alliance Court
Now over 80% let, Phase 1 still has one unit available, of 1,436 sq ft (136m2), together with five allocated parking spaces.
PHASE 2
Available on a Design & Build Basis, Phase 2 can accommmodate up to 5,996 sq ft (557 m2). Car parking allocation dependent upon unit size.
PHASE 3
Available on a Design & Build Basis, Phase 3 can accommmodate up to 14,000 sq ft (1,300 m2). Car parking allocation dependent upon unit size.